Every office, shop, clinic and restaurant in Dubai needs approval before fit-out work starts. For drafters and small design studios, the hardest part is not the design. It is knowing which authority reviews the project, what drawing set they expect and how to present changes so the file does not bounce back. This guide summarises the fit out approval Dubai process from a drawing-production point of view.
Rules and portals are updated from time to time, so always confirm the current checklist on the official website of the relevant authority before you submit.
Step 1: Identify the Approving Authority
The location of the unit decides who reviews it. Broadly:
- Dubai Municipality for most mainland plots.
- Dubai Development Authority (DDA) for its free zone communities such as Dubai Internet City, Dubai Media City and Dubai Studio City.
- Trakhees for areas under Ports, Customs and Free Zone Corporation, including JAFZA and several Nakheel communities.
- Other master developers and free zones may run their own approval process before or alongside the authority.
The landlord or facilities management team can confirm the route. Ask early, because each authority has its own drawing standards and portal.
Step 2: Collect NOCs and Documents
Almost every route requires a landlord or developer NOC, a tenancy contract or Ejari, the appointed contractor's trade licence and an appointment letter. Civil Defence approval is usually needed for fire and life safety elements. Your drawings are only one part of the package, but they are the part most often returned for correction.
Step 3: Prepare a Complete Drawing Set
A typical fit-out set includes:
- Cover sheet and schedule of drawings.
- Key plan showing the unit within the building floor.
- Existing or as-approved layout.
- Proposed architectural layout and partition layout.
- Furniture, flooring and reflected ceiling plans.
- Sections through partitions and ceilings, with heights and materials.
- Door and finishes schedules.
- MEP layouts where services change, such as HVAC, drainage, lighting, power and fire fighting.
DDA publishes a fit-out drawing list and a drawing submission circular that asks for A1 sheets in DWF format, monochrome linework and separate files per sheet. Trakhees asks for PDF drawings showing existing and proposed plans, elevations and partition sections. These details show why one template does not fit every authority.
Step 4: Show Changes Clearly
Reviewers want to see exactly what changes. Present the latest approved drawing next to the proposed one and cloud every modification. DDA's circular, for example, describes yellow clouds on approved stamped drawings and red clouds on proposed drawings. Even where colour rules are not specified, consistent clouding and a revision table save a lot of review time.
Drafting Standards That Prevent Rejection
- Use the authority's drawing numbering and naming convention, not your office's internal codes.
- Keep text heights readable at the printed size. Tiny notes are a common comment.
- Dimension corridors, exits and door widths clearly, because fire and accessibility checks rely on them.
- Show ceiling heights, bulkheads and access panels on the reflected ceiling plan.
- Coordinate partition types with a legend and a typical section for each type.
- Make sure the title block shows project, unit number, consultant, contractor, scale, date and revision.
Where Marble and Joinery Shop Drawings Fit In
Authority approval normally covers layouts, partitions, services and safety. Detailed marble, stone and joinery shop drawings usually go to the consultant and client for approval, not to the authority. Plan both tracks in your programme: authority drawings first so the permit is issued, then shop drawings so fabrication can begin without delaying site work.
Practical Timeline Tips
- Start the authority drawing set as soon as the layout is frozen.
- Prepare MEP and fire drawings in parallel with architecture.
- Keep a log of every comment received and how it was closed.
- After approval, store the stamped set as the base for any future modification.
Final Advice for Small Studios
Create a reusable fit-out template for each authority you work with: title block, sheet numbering, layer standards, standard partition legend and general notes. When the next project arrives, you only change the unit-specific content. Keep a short internal checklist of the comments you have received on past submissions and review it before every issue. Over a few projects, this habit reduces resubmissions more than any other single step.
Frequently Asked Questions
Who submits fit-out drawings in Dubai?
Usually the appointed contractor or consultant submits through the authority portal. The designer prepares the drawings and supports the response to comments.
Can I start site work while approval is pending?
Starting before approval can lead to stop-work notices and penalties. Wait for the permit, and check the authority's rules on any minor works exemptions.
Are interior shop drawings submitted to the authority?
In most cases detailed shop drawings for marble, joinery and finishes are reviewed by the consultant, while the authority reviews layouts, services and safety drawings.
Related Reading on ShoaibSite
Written by Shoaib Hussan, Founder of D3DDD – Dubai 3D Design & Draft.
Instagram: @mxhaib
Need drawings or 3D? Visit d3ddd.com or email info@d3ddd.com.

ConversionConversion EmoticonEmoticon